Extension Logo
Extension Logo
University of Minnesota Extension
extension.umn.edu

What to consider when planning an agricultural drainage system

Wetland compliance

Figure 1: Farmed wetland. Photo: Brad Carlson.

Before starting a drainage project:

  • File the Wetland Conservation Certification (Form 1026) with the Farm Service Agency (FSA).
  • Complete the certified determination of wetlands (Figure 1) from the Natural Resources Conservation Service (NRCS). Compliance with federal Swampbuster rules is the operator’s responsibility.
  • Visit your county Soil and Water Conservation District (SWCD) office to ensure you won’t be violating either the U.S. Army Corps of Engineers’ rules or the Minnesota Wetlands Conservation Act. Compliance with FSA rules doesn’t ensure compliance with either of these rules.
 | 

Installer

Figure 3: Tractor-mounted tile drainage plow. Photo: Brad Carlson.

Will you or a contractor be installing the drainage system? Tractor-mounted/pulled drainage plows (Figure 3) are increasingly popular, but there’s more to drainage installation than meets the eye.

Discuss installation with a local contractor before making the decision to install your own system. Ask yourself if you have the time, labor and know-how to do your own installation.

 | 

Brad Carlson, Extension educator and Gary R. Sands, Extension engineer

Reviewed in 2026

Page survey

© 2026 Regents of the University of Minnesota. All rights reserved. The University of Minnesota is an equal opportunity educator and employer. This work is supported by the U.S. Department of Agriculture’s National Institute of Food and Agriculture.